The reliable way to get work you want

How to find the work you want
STEP 1
Receive tailored leads
Set up your free professional profile and we’ll send you leads that match your skills and work area.
STEP 2
Express interest
Respond to as many leads as you like. Based on your profile, work history and reviews, customers decide who to share their details with.
STEP 3
Connect and arrange
If you're shortlisted, we charge you a fee for the customer's contact details so you can get in touch to exchange more details about the job.
These leads might interest you

Shed base
Need topsoil clearing, hardcore putting down then 4-5 inch of concrete. Approx 9ftx9ft

Dig foundation and lay concrete base
Rough ground at the moment. It’s the space behind the 4 bins in the pictures. Needs ripping out and taking away, and converting to a concrete base ready for a sectional concrete garage. The garage size would be 8ft 5 wide x 14ft 3 long. The space may be slightly larger.
Please contact via email

Rear rain gutter drainage replacement/upgrade
I have two small exterior drainage/guttering jobs that I’d like looked at:
1. Rear downpipe/drain connection
At the rear of the house, I’d like the bottom section of the rainwater downpipe improved where the square downpipe currently changes to a round pipe and enters the drain.
Rather than having the downpipe connected into the small pipe/opening currently in the ground, I’d like this replaced with a larger open-top trapped rainwater gully/pot with a removable grid, with the downpipe terminating above it so that rainwater can discharge freely into the gully.
The existing square-to-round connection/downpipe section can be replaced or altered as necessary to give a neat, reliable installation and ensure the water drains away correctly.
1). Would like to know what this might cost
2). Would like to know when this could be done.

Floor screeding / Self Leveling Compound
0.5 - 1.5cm of existing concrete floor has been dug out. I need about 20-25m2 of new concrete floor to be level, and brought up to the same height. Old layer had a sulphate attack.

Drainage channel
I have a concrete area that continually floods when it rains. I’d need a drain installed around 4m long to channel the surface water to a nearby gully. I’d also like a single step to a shed installed - as shown in the photo.
