Well this individual is either ungrateful, suffering from short term memory loss or he's talking about another tradesman.
job was investigate locate fault to light circuit which was done,
turns out he had an electrician who wired a 13 double socket into the light circuit, all cables chased into the wall and plastered.
it was explained to Lester Hannington this would need rewiring and how much the cost would be which he agreed to. on the day of the works he asked for another double socket on other side of room which would naturally take more time and cost more, it turns out two double sockets were wired into the light circuit all chased cables buried and plastered over.
so come on Lester Hannington tell the truth.
Reply created 10 Sep 2016