Skip to main content
A construction worker performing core drilling on a concrete surface using a heavy-duty drill machine. The image highlights the drilling process, equipment, and setup, illustrating the typical work involved in core drilling projects, which affects overall costs

How Much Does Core Drilling Cost?

Updated on

Wondering what it costs to drill clean, precise holes in concrete? On average, core drilling can cost around £50 to £150 per hole, depending on project specifics like depth and material. Read on to learn about the factors that influence these costs and how to budget effectively for your next project.

Want to get quotes from local tradespeople?

4.8

Top rated Builders

Our Builders, are rated 4.8 out of 5 based on 1041 reviews from customers like you.

Quality screening

Easily find verified local tradespeople. Just post your job to get quotes from tradespeople near you across the UK.

Core Drilling Costs: From Hire Rates to Per Hole Pricing Explained

Explore how core drilling plays a key role in modern construction and why it’s essential for precision work. With costs varying widely, understanding expenses is important for budgeting your next build. From hiring equipment to the expense per hole, this guide will illuminate these often overlooked details. Read on for more.
In this Price Guide we will talk about:

  1. Why Is Core Drilling Necessary?
  2. What Does Core Drilling Cost?
  3. Professional Core Drilling Costs
  4. Core Drilling Materials & Tools
  5. Additional Costs
  6. Find Verified Groundworkers on MyBuilder
  7. Common Questions

Why Is Core Drilling Necessary?

Core drilling creates precise openings in concrete and other hard materials. It serves a pivotal role in a variety of projects, from installing plumbing to electrical systems. For example, when fitting new water lines through concrete walls or foundations, core drilling is often essential. To better understand related costs, check out our water line installation cost guide.

Cost Overview: What Does Core Drilling Cost?

For a standard overview of costs, the average core drilling expenses range from £26 for smaller holes to £116 for larger ones. These costs may include labour and material charges, making it important to evaluate the specific needs of your construction activity.
Diamond core drilling can also be a consideration, especially for tougher materials like reinforced concrete, which may increase the cost due to its precision and durability.

Cost FactorAverage Cost
Core Drilling (52mm hole)£26-£35
Core Drilling (127mm hole)£29-£36
Core Drilling (152mm hole)£37-£46
Core Drilling (300mm hole)£86-£116
Diamond Core DrillingTypically £80+ per hole depending on size and material

MyBuilder Tip: Consider obtaining quotes from multiple providers to ensure you get good value for your project.

What Influences Core Drilling Costs?

Several key factors determine the final cost per hole:

  • Diameter of the hole: Larger holes require more labour and equipment, raising costs.
  • Material being drilled: Harder materials like reinforced concrete are more expensive to drill through.
  • Location of the project: Regional labour rates and accessibility can impact pricing.
  • Quantity of holes: Drilling multiple holes often reduces the per-hole price due to economies of scale.

Professional Core Drilling Services: Hiring and Costs

Hiring professional services helps ensure precision and safety during drilling tasks. The cost for a two-person team can be around £540 per day, covering both labour and materials. This is especially practical for multiple holes or larger diameters.

  • Labour: Typically calculated per hour with prices ranging from £20 for basic tasks to £50 for more complex drilling scenarios.
  • Materials: Depending on the scope, necessary materials can contribute £140 per day to the total cost.

Services provided by core drilling companies often include:

  • Site Assessment: Evaluating the site for safe and efficient drilling operations.
  • Project Planning: Detailed planning to ensure all client requirements and safety protocols are met.
  • Executing Drilling Tasks: Skilled execution of drilling, ensuring minimal disturbance to the existing structure and surrounding environment.
  • Debris Removal: Efficient removal of debris and clean-up post-drilling to maintain site cleanliness.

Save money, energy and resources by hiring a professional tradesperson for your core drilling project instead of tackling it yourself. Post your job on MyBuilder today to compare quotes from verified groundworkers near you and find the right tradesperson for the job!

Find professionals for your groundwork today

Core Drilling Materials & Tools: What Are the Costs?

Core drilling requires specialised equipment that varies in price depending on its capabilities and the duration of the hire. These tools are essential for precision cutting in concrete and other hard materials, providing clean and efficient results.

Below are the typical costs of core drilling materials and tools:

Handheld Dry Core Drill (up to 152mm)

  • 1 Day: £35
  • 2 Days: £46
  • 3–7 Days: £75
    Wet Core Drill & Rig (150mm capacity)
  • 1 Day: £70
  • Weekend: £80
  • 1 Week: £200
    Wet Core Drill & Rig (450mm capacity)
  • 1 Day: £120
  • Weekend: £140
  • 1 Week: £280
    Core Drill Bits
  • £20–£50 each

Remember: When budgeting for these tools, also consider potential additional costs such as personal protective equipment (PPE), delivery charges, and any extra fittings. Hiring equipment suited to your project's specific needs can help manage costs effectively. If you need a digger for your core drilling project, you can also check out our guide on mini digger hire costs to better plan your excavation needs.

For seamless and precise core drilling, hiring a verified professional is the best solution to ensure high-quality results and safety. Post your job on MyBuilder today to find a local groundworker who can professionally handle your project.

Discover reliable groundwork specialists now

Core Drilling Safety and Additional Costs

Safety is of utmost importance in core drilling operations, as these projects often involve heavy machinery and complex procedures.

Proper safety gear and protocols are essential to protect workers and ensure a smooth operation. Alongside safety considerations, several additional costs can impact your overall drilling budget.

  • Permit and permission fees: These may be required depending on local regulations.
  • Accessibility issues: Challenging or confined spaces may require specialised equipment or techniques, adding extra costs.
  • Waste disposal and site cleaning: These should be factored into your budget to ensure the project area is managed responsibly. If you need help with waste removal, consider checking out our guide on skip hire costs.

Get Expert Core Drilling: Find Verified Groundworkers on MyBuilder Today!

Ready to tackle that core drilling project but not sure where to start? With MyBuilder, you can easily connect with verified groundworkers who are ready to bring your vision to life. Benefit from transparent quotes and quick communication, ensuring your project gets off the ground smoothly and efficiently. Don't wait any longer—post your job now on MyBuilder to find the right tradesperson for your needs!

Get your core drilling project started

FAQ: Common Questions Readers Ask About Core Drilling

What are the potential benefits of using diamond core drills for concrete projects?

Diamond core drills provide high precision, making them ideal for creating exact holes with minimal disruption. This is crucial in sensitive environments like hospitals, where structural integrity is important. The process is quiet and minimally disruptive, perfect for noise-sensitive areas. These drills are versatile, capable of handling reinforced and non-reinforced concrete, stone, and other hard materials. Additionally, using water as a lubricant reduces dust, ensuring a cleaner and safer worksite.

What are common challenges faced in core drilling operations and how can they impact costs?

Core drilling operations face challenges like equipment wear, unexpected obstructions and operator skill. Abrasive materials can degrade drill bits, raising maintenance costs. Encountering rebars or other obstructions can cause delays and extra expenses. Additionally, the operator's skill affects efficiency — poor technique can lead to more wear and slower progress. These factors all contribute to the overall cost of the project, highlighting the need for personnel with suitable experience and well-maintained equipment.

What should I consider when looking for diamond drilling services in my area?

When choosing diamond drilling services, consider the company's background and reputation, ensuring they have positive feedback. Verify they hold the necessary certifications and licences. Check if they use modern, well-maintained equipment suited to your project. Ensure they follow strong health and safety protocols. Finally, compare quotes and timelines to get a competitive rate without compromising quality.

Related questions on Ask a tradesperson

See what others are asking our expert tradespeople. Browse all questions

Groundwork & Foundations

front steps to house need rebuilding

Anonymous user 27/06/2026 - 9.22 AM

Who does this sort of work if concrete is used? I am having a problem finding the right sort of tradesperson to invite.

2 answers

Groundwork & Foundations

cripple or pony wall supporting floor joist

Bill 27/06/2026 - 9.21 AM

I am designing a 24 ft x 44 ft house with crawl space and a 2 x 6 pony wall down center on a 8" x 18" continuous footing. Is this pony wall adequate for supporting the above floor based on 50 lbs. per sq. ft?

1 answer

Groundwork & Foundations

Breeze block planter foundations in waterlogged clay corner

Luisa Volpe 20/05/2026 - 9.18 AM

Hi all, Looking for some advice on a build in a very waterlogged clay garden. We’ve already installed several French drains, which have helped overall, but one corner remains problematic. We’re planning to build a Mediterranean-style raised planter using breeze blocks in that area. We’ve excavated approx. 40 cm down x1mt area and the ground now feels much firmer (fork doesn’t penetrate easily anymore). Proposed build-up: - At base: existing clay subsoil - Lay non-woven geotextile membrane - Add 15 cm of 10–20 mm shingle for drainage For the structure itself: - Form a footing trench with wooden boards(approx. 30 cm wide, L-shaped around planter areas) Then another layer of geotextile - Fill with ~10 cm MOT Type 1 (compacted) - Then 15 cm concrete footing, potentially reinforced with rebar Additional constraint: There are existing concrete fence post footings (“concrete lumps”) in this area which support the fence posts. Questions: 1. Does this layered approach make sense for this type of ground, or am I overcomplicating it? 2. Is the double geotextile layer (below and above shingle) appropriate, or unnecessary? 3. Would you trust this as a stable base for a block planter, or should the footing go directly onto the subsoil/MOT without the shingle layer underneath? 4. Any better approach for dealing with the waterlogged clay in this situation? 5.What’s best practice for building on top of existing fence post concrete footings? OK to pour new concrete on to, or should there be a gap/isolation? Appreciate any input. I am keen to get this right before pouring concrete. Thanks!

1 answer

Need expert advice?

Ask a question