Connor 16/06/2026 - 8.01 AM
Hi all, I’ve recently stripped out a concrete pad and want to install a patio. When digging out I found the foundation for my house so I’ve installed the acos in top of the foundation and my new finish level is 80MM above previous finish level and 70mm below DPC. Looking at the photos will this be acceptable? If not would installing additional drainage directly next to the house in the gaps would this fix the issue? Final option is digging out all the type one and reducing existing levels remove the acos and have the fall away from the house. (Probably would have been best option but I’m pretty invested in this setup right now). Thanks