After purchasing an house with structural issues I engaged a structural engineer to do a survey. He suggested the installation of a ridge beam to counteract roof spread and provided calculations for the specifications of this beam. I then engaged a builder to instal the ridge beam as per the calculations. Upon completion and after inspection, building control have sent a form requiring the signature of the principal designer and both the structural engineer and the builder are claiming they are not the principal designer. I am the home owner. How do I resolve this?

Are you a tradesperson and able to answer this question?

3 Answers

Design studio 71

Rating: 5 out of 5
Birmingham
Hi, structural engineer who made drawing for beam calculation, he is responsible for design and calculations. Builder will just follows his drawing and specifications
Answered9 January 2026
0

ADR Property Maintenance

Rating: 5 out of 5
Boston
The princable designer is the person that did the calc & drawing, while the builders is the principal installer.Yes this is a building regs tactic to avoid there responsabilty they are the ones charging for checking then throwing the responsabilty back onto the house holder!.
Answered9 January 2026
0

East Pallant Developments Ltd

Rating: 5 out of 5
Havant
The appointed structural engineer is the qualified paid expert responsible for working out the loads and calcs. The builder / installer will then have the information to install the correct beam . Please note I’ve known in the past the Engineer and the BC structural engineer to have conflicting views !