how long does screeding take to dry
Anonymous user 14/03/2024 - 2.37 PM
how long does screeding take to dry before u can do the underfloor heating.
Are you a tradesperson and able to answer this question?
7 Answers
JSA Carpentry and Construction Ltd
Rating: 5 out of 5
Standard screed drys at a rate of approximately 1mm per day. If you mean when can the underfloor heating be switched on after screed I would recommend waiting a minimum of 28 days then set the underfloor heating to a very low temperature and increase of a rate of 1° per day to slowly allow the screed to warm to desired temperature.
Answered13 January 2024
1
Anonymous user
Would recommend 48 hours before doing any kind of work to the floor
Answered13 January 2024
0
Anonymous user
at least a week i guess so.
Answered13 January 2024
0
Class Construction Ltd
Rating: 5 out of 5
I would recommend a week before you do anything on the floor
Answered14 January 2024
0
Anonymous user
It completely depends on the thickness of the screed and if it’s liquid or not. But 4 weeks to wait is a good rule of thumb
Answered14 January 2024
0
FBF Construction Ltd
Rating: 5 out of 5
i will say is about 4 to 6 weeks for installing the wooden floors on top and 2 weeks to install tiles
Answered14 January 2024
0