Roofer increased price of work after realising more work is needed
Anonymous user 23/02/2024 - 3.52 PM
We are redoing our flat roof and have agreed a price of £12.5k to do it. The work started today and the roofers realise that there are stramit boards under the first layer which they can't put the new felt on. So he believes he now needs to take away the boards and replace it with insulation before finishing as planned. He has been fairly straight with us: explaining the situation and mentioning the cost will increase but obviously waiting for our approval to go ahead. However, since they've started ripping off the roof already, we don't feel like we have much of a choice. We are waiting for a detailed quote but they mentioned it could add-up to an additional 6k (for labour time and skip needed to remove the starmit boards, as well as the insulation material and 9mm boards). This is much more than we expected so we want to get a sense of whether they're pushing it too far or whether that seems reasonable. The initial £12.5k was for the following: To erect scaffold To remove existing roof membrane to both gulleys front and back To install a new tiled section to fromt and back of property including a new treated batten and membrane To install new flat roof at crown of property with new 3 layer fekt system and new 18mm smart ply The new additional quote is for: To remove 3 different roof membranes To remove all concrete stramit boards To install new furring piece ( creates new roof flow ) To install a new 18mm ply board to roof joists To install new 100mm insulation board To install new vapour barrier To install new 18mm ply board
Are you a tradesperson and able to answer this question?
5 Answers
ADR Property Maintenance
Exall Roofing Ltd
P b roofing
Strata Roofing ltd
Premier Roofing, Repairs & Maintenance Ltd