Cracks appearing after re-skimming of living room ceiling
Anonymous user 09/03/2024 - 3.32 PM
What is the best remedy to cover cracks that’s have appeared on ceiling following re-skimming and and 3 layers of paint? Only be 2 months since job and slightly larger than hair line as they have come through the paint.
Are you a tradesperson and able to answer this question?
6 Answers
A TO Z PROPERTY MANAGMENT LTD
Rating: 4.9 out of 5
Your must must be base in ceiling boards to appear crack that quick. Possibletys
1* it was large gap did filled in well.
2* boarding wasn't layout properly and didn't attached how needs to me.
3 * When your neighbours walks o top floor cause vibration because of forst two reason.
You have to open up cracks with sharp boarding knife, than you apply filler properly , top on filler apply mesh smooth with filler ,centre the cracks and100mm wide each side smooth and wait until properly dry sand and paint that's shout be fine.
Hope that's helpful
Answered3 December 2022
2
Mario P&D
Rating: 4.8 out of 5
hi, cracks appear most of the time in the ceiling because the plasterboard is not installed properly (the boards must be intercalated, which many do not do), in order to repair the crack, you need to deepen it, tape it and then plaster it
Answered10 December 2022
0
M R Jenkins Plastering Services
Rating: 5 out of 5
Cracks can appear for a few reasons . Boards not staggered properly and too many straight joints. Not enough screws used and not firmly fixed especially if it was an overboard of existing ceiling . Vibration from above can also crack the ceiling .
I would suggest to take out with a Stanley knife to form a V then fill with a superior filler and leave it slightly proud . Then rub down with a P120 grade sandpaper . Other than that you could scrim the joints , PVA the ceiling and Reskim it again but obviously last case scenario because of what’s involved .
Answered22 December 2022
0
JDL plaster and render
No reviews yet
Depends on original state of ceiling and plasterboard!
Movement from above could have had an effect but not if crack appeared after 2 months and bigger than hairline!
Best way is to find a good decorator to refill crack. You wouldn’t want to re plaster due to weight which could likely crack again so a reboard would be needed
Answered25 December 2022
0
RGM Plastering
No reviews yet
Plaster isn't structural, it's only cosmetic. Sounds like the cracks were already there and would come through a new layer of skimming. Movement in the joists can cause cracking, especially if its a double joist and the boards were jointed onto it. Also old lathe and plaster ceilings can deteriorate and are often covered in cracks.
I'd suggest overboarding it, making sure the plasterboard joints don't land on a crack. Take more care in applying scrim tape and maybe add fibres to the first skim coat. Screwing new board up should help tighten any movement in the ceiling as well, and provide a bit more sound/heat insulation.
Answered10 March 2024
0