Question category:
Groundwork & Foundations
Anonymous user 30 December 2021 - 2.21 PM
Lifted my old asphalt and concrete flooring on my 1820s cottage and wanting a quote to MOT, sand, visquine, insulate and slab and underfloor heating. What's the correct method of doing this? 66.2m² is the total area to be done and will want it at 100mm. Am I right in thinking I require 6.62m³? How much will this costs roughly? Thankd
Yes, any area x depth (or height) gives you a cubic metre value. Always allow for wastage!
Answered
30 December 2021
Like