How long does/should it take a decorator to line 2 walls before painting?
Anonymous user 16/03/2024 - 2.43 PM
Both walls are standard height 2.1m (h) x 2.7 (w). Also the lining paper is 1200mm - should it be hung vertically or horizontally? Thanks
Are you a tradesperson and able to answer this question?
4 Answers
Anonymous user
Should get the lining done in the day and pain when all is dry and ready to go, so the next day I’d say
And if it is a flat wall a then you should be doing it length ways
Answered29 July 2021
5
I C DECOR
Rating: 4.6 out of 5
2 walls lined should take no more than 4 hrs and should always be crossed lined so there is minimum joints
Answered4 August 2021
1
Timothy David Interiors
Rating: 5 out of 5
1200mm??? What lining paper is that??
Do you mean 1200 grade?
That relates to the thickness of the paper not it's linear dimensions.
Is it non-woven lining paper?
Is there any prep to be done?
Is the room clear of furniture?
Do the walls need sizing first?
As to whether it's hung vertically or horizontally. Whatever works out easiest
Answered29 July 2021
0
Anonymous user
All depends on the substrate!! If there’s not much preparation needing done ? Then a day should be more than enough.
Answered8 August 2021