Anonymous user 16/03/2024 - 2.43 PM

Both walls are standard height 2.1m (h) x 2.7 (w). Also the lining paper is 1200mm - should it be hung vertically or horizontally? Thanks

Are you a tradesperson and able to answer this question?

4 Answers

Anonymous user

Should get the lining done in the day and pain when all is dry and ready to go, so the next day I’d say And if it is a flat wall a then you should be doing it length ways
Answered29 July 2021
5

I C DECOR

Rating: 4.6 out of 5
Oldham
2 walls lined should take no more than 4 hrs and should always be crossed lined so there is minimum joints
Answered4 August 2021
1

Timothy David Interiors

Rating: 5 out of 5
Tonypandy
1200mm??? What lining paper is that?? Do you mean 1200 grade? That relates to the thickness of the paper not it's linear dimensions. Is it non-woven lining paper? Is there any prep to be done? Is the room clear of furniture? Do the walls need sizing first? As to whether it's hung vertically or horizontally. Whatever works out easiest
Answered29 July 2021
0

Anonymous user

All depends on the substrate!! If there’s not much preparation needing done ? Then a day should be more than enough.
Answered8 August 2021