Anonymous user 23/02/2024 - 3.41 PM

Hi I am having a bathroom installed, and I discovered the tiling is higher than the linear drain metal trim, as a result it looks pretty awful and there is grout just sloping down, they also install the middle piece of the linear drain where the tiles installed the wrong way. Does it all need to be ripped out to be fixed?

Are you a tradesperson and able to answer this question?

3 Answers

Anonymous user

That was a poor finished but I will advise you that if the water is draining without settling around the tile is not a problem. My advice whenever you are hiring someone that person need to do the job that will makes you happy.
Answered8 June 2021
5

Al’s Home Repairs

Rating: 5 out of 5
Downham Market
Hi As you have several concerns I would start from basics. Any professional would start from scratch. You have wet grouting which suggests water ingress. Obviously you need to you need to make sure everything thing has been done correctly. You need to get someone in to view the problem to give you the correct answer.
Answered8 June 2021
0

Mike Guest Electrical Plumbing Building

Rating: 4 out of 5
Brecon
Linear drain should finish level with top of tile The cross water low level trays come with the linear waste built in and avoid the need for tiling the shower base. Kudos also make a wet room former which can be fitted in a wooden floor or concrete floor. The most important point is the waterproofing of the area under the tiles by using either of the trays above you avoid the problem of water leaking through to the underfloor .
Answered8 July 2021