Skip to main content

Ready to hire?

Post your job in minutes, browse real reviews and choose who to speak to.Post a job

Need some tips or advice?

Ask a question
Carpets, Lino & Flooring

Fit 2 rows of engineered oak floor in the middle of room after stud wall removal

Anonymous user 03/03/2024 - 3.36 PM

Some people told me the half room's floor need refitting from the point of the 2 rows. 2 stud wall removed to create an open space feeling. This is in the middle of the room. The previous builders- who removed the wall, have filled the gap by fitting two rows of original floor from the storage room- they were glued.but they fit with two cross joints and squeaking. Picture has just been advertised as a new job today. I have found a matched floor. Colour is not a concern, the original floor has a big range of colours.

Are you a tradesperson and able to answer this question?

5 Answers

Z Ellison

Rating: 5 out of 5
Newmarket, Suffolk
Yes it’s correct half the floor would have to be re done
Answered20 January 2021
2

DB MAINTENANCE WORKS LTD

Rating: 5 out of 5
Lower Edmonton, London
In order to get the tongue and groove locked in and the strength from that you would need to lift the floor. Big job but worth it.
Answered20 January 2021
0

MS CARPENTRY LTD

Rating: 5 out of 5
Cambridge
You can just cut the affected boards out and replace with new .
Answered22 January 2021
0

Geoff Spencer Joinery

Rating: 5 out of 5
Kinross
Do half the floor no big deal once you get stuck in.
Answered28 January 2021
0

Warne flooring ltd

Rating: 5 out of 5
Epsom
You can continue laying the flooring from this point as long as the new flooring matches up with the old. All subfloor boards should be screwed into the joists.
Answered29 January 2021
0