Ready to hire?
Post your job in minutes, browse real reviews and choose who to speak to.Post a jobNeed some tips or advice?
Ask a questionElectrical
Add additional fuse box or replace/upgrade existing one?
Anonymous user 28/02/2024 - 3.52 PM
I am renovating in my house and will now exceed the RCD capacity of my consumer unit. I know my fuse box cannot current handle the additional load. Should I add a second fuse box or replace the existing box? Also, does anyone ever buy the old boxes? I think this one is only 7 years old.
Are you a tradesperson and able to answer this question?
3 Answers
Anonymous user
Hello,
How do you know you’re going to exceed your RCD current rating? Have you calculated / measured the maximum demand of your electrical installation? Assuming your property is a single dwelling, SPD’s aren’t a requirement of BS 7671 2018. The total value of your installation and equipment becomes the deciding factor in whether or not you risk negating it. I see too many electricians making their potential clients pay for this aspect, and charge a lot more for it.... when it isn’t really required. Regulation 443.4, page 101, provides the four examples where SPD’s are a requirement. It then goes on to mention a risk assessment exercise.
Would it be beneficial to have a metal CCU fitted? Perhaps.
Does it need to be done? Maybe.
As always, get somebody to have a look at it and give you advise, hopefully honest advise 😊
Regards,
Carl.
Answered9 September 2020
7
T H Electric
Rating: 5 out of 5
Definitely best to replace it with new one. Metal box, full RCBO unit with SPD protection.
7 years old is likely plastic one (non fire rated) which does not comply with 18th Edition of BS7671 so I doubt that you would sell it. However you can try to sell the RCDs and MCBs but you would get pennies for them.
Answered8 September 2020
1
Output electrical ltd
Rating: 5 out of 5
Hi you can how ever install a separate inclosure depending on how many xtra circuits you want depends on how big of a inclosure you get. You can put a rcbo inside and that is a RCD built into the mcb in simple form.
You will need to seek a qualified professional to carry out this work as it will involve adapting the meter tail and splitting them between your old consumer unit and your new inclosure.
This would be a cheaper option less work and still safe and convenient.
Hope that helps
Output electrical ltd
Answered9 September 2020
0