Hi, I’d appreciate some advice on this matter any help is welcome. We have a kitchen in an extension part of the house it is a normal pitched roof with a hip at the end approximately 2.5 x 4 m it’s a narrow U-shaped kitchen. It is single storey. Currently the ceiling is flat and it feels quite enclosed. I wish is to remove the ceiling plasterboard and vault The ceiling by installing collar ties braces using appropriately sized timber and bolts etc. I have been reading a bit about this but it’s still unclear. My questions are Do we need planning permission to do this? •What size collar ties are required? •Will I need a strict so engineer to tell me what’s required? I’m a pretty commentary DIYer e.g kitchen fitting flooring first fix stuff etc. But I don’t want to collar it all up using 5 x 2’s and then it still collapses. I might be worrying about it too much. But I want to be responsible and ensure I do it right.
Are you a tradesperson and able to answer this question?
3 Answers
Anonymous user
Daniel Ellis roofing ltd