Anonymous user 23/02/2024 - 2.40 PM
Are you a tradesperson and able to answer this question?
3 Answers
Anonymous user
Hi the answer to your question is you will need about 3 and a half cubic metres of concrete
M.c.r direct brickwork
Answered18 April 2012
1
Anonymous user
Do you mean the concrete foundations? It depends on the width of the wall, but a metre should do it, 2 ton of all in and 14 cement.
Answered19 April 2012
0
Anonymous user
All depends how deep you dig your footings if you dig 450 x 450 strip with 450 x 600 where pillars are built then .5m3 would be sufficient. Set your levels 150mm below surface. Get a barrowed concrete firm in.
Answered20 April 2012