Anonymous user 15/03/2024 - 2.55 PM

I am looking at getting 3 walls of my detached property repointed in Lime mortar roughly 220m2, how long will take and how many man hours/days?

Are you a tradesperson and able to answer this question?

6 Answers

propoint southwest ltd

Rating: 5 out of 5
Newton Abbot
depending if its brick or stone. but about 2 weeks
Answered26 April 2020
4

Anonymous user

5/6days
Answered27 April 2020
1

Anonymous user

Is it brick or stone,I recommend using nhl3.5 with clean well graded sand not building sand 1 fine sharp and 2 soft sand and 1 lime is normally suitable for joints up to 20mm.Assuming conditions are perfect ie weather and exposure to wind which will cause the pointing to fail. rake out and pointing assume 10m2 per man day.if anymore than this is being done it is being rushed,not being looked after and will more than likely fail .this is not a job that should be rushed and where speed and cost comes before quality
Answered24 May 2020
1

Anonymous user

Working on a timeframe of 8-10metres squared.angle grinded out and pointed in a day, and scaffolding already in place shouldn’t take longer than 3weeks
Answered29 April 2020
0

Anonymous user

It will take 2 men 2 days to rake out and wash down,and 3 pointing specialist 2 days to repoint, this would be around 35 m2 each man a day. In total job would take 3 days as pointers would follow on rakers day two. Hope this helps . Thanks Lee
Answered30 April 2020
0

Hamilton Contracts

Rating: 5 out of 5
Kidderminster
What lime.. hydrated or hydrolic..the difference is enormous..
Answered2 May 2020