Skip to main content

Ready to hire?

Post your job in minutes, browse real reviews and choose who to speak to.Post a job

Need some tips or advice?

Ask a question
Roofing

Advice on Apron Flashing over a Lean to Roof

Anonymous user 03/03/2024 - 3.27 PM

Hi All, We have recently added a new rear extension 3.9m by 3 m. The roof is a pitched lean to roof with a pitch of 17 degrees . The builder has put an apron flashing where the lean to roof abuts the wall. The builder has used a code 4 lead - 25 mm tucked into the wall, 75 mm upstand from the lowest part of the tile profile, 1.5 m max length of flashings with laps of 200mm and 200mm of the apron lap over the tile. Therefore he has used 300mm Code4 lead rolls cut into 1.5 m lengths. When the building control inspector was on site - He recommended that the lap between flashing pieces and the apron lap over the tile should be 290mm based on a table from the RLSM manual for pitch dependent lap lenth. My builder continues to insist and quotes a different section of the RLSM manual and says the lap length should be 200 mm for low pitched roofs for lean to roofs. The tiles used are redland grovesbury tiles. They have a profile and the lead has been bossed to fit the profile. Also the building control recommends that the free edge of the lead be clipped . The builder has said he has used silicone instead to fix the free edge. Can you please advice on the right specifications to follow for a lean to roof. The key question being what should be the laps between flashing peices as well as overlap over the tile for the apron for a 17 degree lean to roof.

Are you a tradesperson and able to answer this question?

5 Answers

Anonymous user

Whatever the building control officer wants is what they shall get, There's no arguing with them guys, Different council districts have different rules and regulations
Answered12 February 2020
3

ADR Property Maintenance

Rating: 5 out of 5
Boston
your builder can quote whatever rule he likes at the end of the day building control will not sign the job of until he is happy, so unless you want a long drawn out saga change the lead , its a bitch but sometimes you just have to bite the bullet building regs always have the final say and once one has dug his heels in regardless of who is right or wrong the building inspector is always right. good luck Alex
Answered12 February 2020
2

Top 2 bottom

Rating: 5 out of 5
Blandford Forum
Building control specifications vary from area to area in my mind 290mm of headlap is plenty the headlap on the lead doesn’t need to be anymore than the headlap on the tiles, it may be worth asking him this question. Also with the lead straps I’m always in favour of straps over glue. Cheers
Answered17 February 2020
1

Pound for Pound

Rating: 5 out of 5
Rugby
Go over the building control officers Head to his boss and get a second opinion . Straps are better than silicon . if after that your still in the same situation alter the lead work how the building control officer wants it. Its the only way to get it signed off.
Answered18 February 2020
1

Anonymous user

I agree with all the answers given you have to do what the building inspector wants unfortunately otherwise they will not sign off and it will end up costing you more.
Answered18 February 2020
0