Plastering Question

Any help with dot and dab onto waterproof membrane?

i can get the boards all plumbed up on the mesh membrane like i can on a normal wall but it seems to move afterwards and you can only really tell once its been skimmed. any help with stopping this happening would be great

3 Answers

you need to make sure you have enough fixings per mtr on the membrane it sounds like the weight of the boards and adhesive is too heavy for the amount of fixings you are putting in
Otherwise your adhesive mix is not stiff enough and therefore the boards are moving before the adhesive has cured

Answered 9th Mar 2012

C W Contractors

Member since 22 Feb 2012

hi,
i always thought waterproof mesh has to have two coat a sbr render mix then skimmed!

Answered 21st Mar 2012

K.Davis Plastering & General Building

Member since 20 Dec 2010

you dont say where this waterproof membrane is if below ground level skim with tanking composite if above ground level skim with a sand and cement 3 to 1 mix add sbr to each mix when set hard and dry fix boards with a stiff dri lining compound mix

Answered 3rd Apr 2012

H Macdonald Building & Plastering Contractors

Member since 27 Mar 2012

Need help with your project?

We have tradesmen ready to help you. Post a job, read reviews and hire today.

Post a job

Need some help?

Post a job on MyBuilder to find quality, local Plasterers who can help you with your project.

Search all questions