How long it takes to wire a NEW 5 bed house/240m2 ?

Anonymous user 23/02/2024 - 3.13 PM

5 bed home, approx. 240m2 in Glasgow. first fix and 2nd fix required. Install underground utility and first fix electrical ( circuits and communication). PV and air source heat pump. 2nd Fix electrical ( circuits and communication) Communication - phone, TV, cable, computer, alarm.

Are you a tradesperson and able to answer this question?

5 Answers

Electrical Safety Services

Rating: 5 out of 5
Dereham
Approx 1 week for a skilled two man team
Answered1 November 2017
1

JPH Electricals

Rating: 5 out of 5
Basingstoke
Phil Ricketts - great answer... Electrical Safety services, wish I could get them done that quick!!!
Answered1 November 2017
1

DEACON ELECTRICAL SERVICES

Rating: 5 out of 5
Grimsby
I actually agree with Electrical Safety Services. That’s a good weeks work for two skilled operatives.
Answered4 November 2017
1

Philip Ricketts Electrical Contractor

Rating: 4.9 out of 5
Abingdon
Hi Ranit B, Before answering your question, An electrian would need further information. Specifically, the construction detail. If the house is a timber framed with engineered joist the time taken will be considerably less than a house constructed in concrete block. The internal walls are they to be dry lined or wet plaster? As a guide therefore I will suggest this as answer A & B ( A being the former) A. 1st fix 15 man/day 2nd fix 20 man/day B. 1st fix 25 man/day 2nd fix 20 man/day These are rough guides, other factors such as floor construction, access, builders policy on cleared working areas etc will be factored in Hope this helps Mike
Answered31 October 2017
0

Anonymous user

Approx 2 weeks with 2 skilled sparks and maybe a sweeper up lad! Tea boy! :)
Answered4 November 2017