Skip to main content

Ready to hire?

Post your job in minutes, browse real reviews and choose who to speak to.Post a job

Need some tips or advice?

Ask a question
Electrical

off-peak power points - complicated job?

Anonymous user 03/03/2024 - 3.08 PM

I have economy 7 power and have an off-peak power point in the dining room which is connected to a storage heater. There are no other off-peak power points in the flat. I now wish to have 2 more storage heaters in the 2 bedrooms which will an off-peak power point to be installed in each room. I wish to have these as surface mounts. My question is, should I expect this type of job be a quickish simple one or a long complicated time consuming one. Thanks.

Are you a tradesperson and able to answer this question?

2 Answers

kevin cassidy building contractors

Rating: 5 out of 5
Accrington
Run surface it will be relatively quick and simple.
Answered4 July 2014
1

Electrical Safety Services

Rating: 5 out of 5
Dereham
To install two new off peak circuits in white pvc surface mounted trunking should be around 3 to 4 hours work, and should be a very straightforward task for a registered electrician. Only issue I could foresee is if the off peak fusebox needs upgrading to accept two extra circuits?, but this should not be more than an extra couple of hours work if it was required.
Answered4 July 2014
1