Ask a tradesman

Electrical

What kva do we need for a new build 2 bed detached house

underfloor elect heating, 1 x power shower, 2 x solar water heating panels

3 Answers from MyBuilder Electricians

Total expected load would need to be calculated. This means socket outlets, lighting , cookers, showers etc. It is only a percentage of total expected load required to calculate the max kva needed

2011-07-11T10:05:01+01:00

Answered 11th Jul 2011

The Power in to the house will be determined by the electricity supply that need to be installed by the electricity supplier. This will be a standard feed from the main supply either over head or under ground and will be the same if it 1,2,3 or 4 bedrooms. Only on very large houses and industrial properties is there a need for a larger 3 phase supply.

2011-07-11T10:05:01+01:00

Answered 11th Jul 2011

EDF will probably supply a service head with a 100 map fuse, so Max KA will be 23

2011-07-11T10:05:01+01:00

Answered 11th Jul 2011