We needed a drive and patio designed to prevent flooding from surface water from the roadway. Our new drive was constructed to act as a flood barrier to fall away from the house. Permeable block paving was used on the drive to act as a big soakaway. A wall and raised flowerbeds were constructed. Self closing air bricks were installed all round, and non-return valves fitted in the inspection pit. Kieran and Mark were excellent throughout. They were on site early every day for three weeks and grafted hard all day. They were flexible to small changes of plan, consulted with us the whole time, and kept us up to speed on progress. They came in at the expected price. They like tea - a lot!