How soon the bathroom walls can be tiled after plastering following the removal of the old tiles?

2 Answers

Straight away if the the plaster is not newly done. If you have removed the tiles then skimmed the wall afterwards wait for it to dry completely, prime it, then tile it. 2 weeks is usually a good length of time to allow plaster to dry although by rights you should wait 6 weeks.

Answered 12th Sep 2012

Peterborough Tiling Solutions

Member since 25 Nov 2011

Ensure new plaster is fully dry before fixing tiles to it (4-6 weeks), I also always seal bare plaster whether new or not using an acrylic primer rather than solvent based.
Steve

Answered 9th Jun 2013

Steve Gray Tiling Services

Member since 20 May 2013