Significant structural work, 3 bed bungalow, burton - Restoration & Refurbishment job in Burton On Trent, Staffordshire

Job description

Significant structural work for 3 bedroom bungalow in Burton on Trent. Work to be completed between approximately December 2013 and February 2014. Please quote against each piece of work if possible.

• Laying a hardstanding driveway to the property(~100m)Various methods/materials considered. • Tree removal (5 trees in close proximity to property. • Underpinning of front half of the house. • Re-roofing kitchen extension – tiled, apex design. • Install Central heating system (gas combi-boiler is preferable)To include trench from road to property for gas main insertion – would be necessary before laying driveway (~100m). • Chimney height reduction to roof level. •Inspect drains for root damage.

  • Added 12th December, 2013 : Addendum to the above: Timescale - Work now planned to commence between Late January and Early February. The work is required to be completed within 3 months. Central Heating - Now also considering electric boiler linked to back boiler on woodburner.

Visit to the property recommended. Please contact to arrange a meeting.

Feedback

Feedback for Timbuild Building Services Ltd

Whilst overall this was a big job, involving various contractors working on the property at different times, my partner and I were very happy with the way in which the job was carried out.
The quality of work was excellent and all workmen were friendly and polite.