Extension drainage - Groundwork & Foundations job in Swadlincote, Derbyshire

Job description

Work needed, connecting new foul water to existing drain, this will be done using a inspection chamber.

conecting new rainwater into exisiting rain water. I have already dug 90% of the trench and a hole big enough to take the main inspection chamber.

Quote required to -

Fit inspection chamber and connect foul water pipework. Another smaller inspection chamber will have to be fitted near to the soil down pipe. concrete base will need to be laid to take inspection chambers.

Connect 2 new rainwater downpipes to rainwater drain.

All pipes to be laid on gravel then backfilled to 3 inches below exisitng footway.

Once building control are happy. Any other digging required must be done.

Max 2 days work

  • The following information was added Tuesday, 20th October, 2009 : i have bought all of the materials except the pea gravel.

i have both e=inspection chambers and risers and lids, lenghts of pipe and enough joins.

Feedback

Feedback for Ray Poynton Block Paving & Landscaping

we dug the trench and ray sorted the drains which were passed by the building inspector.

all good, would ask ray to do other groundworks.

nice guy who listens to what is needed and sorts it.