Wiring in outhouse to main junction box - Electrical job in Lewisham, South London

  • Location
    Lewisham
  • Trade
    Electrical
  • Posted
    2099 days ago by katem_32
  • Start date
    As soon as
  • Hired

Job description

Provide suitable sized SWA cable to power out building (approx 30m).

· Route cable from house to outbuilding.

Gland off at either end and terminate on steel adaptor boxes and route cables into consumer units at house and out building ends.

· Fit 32A MCB to existing consumer unit in house.

· Supply and fit small RCD protected consumer unit with 20A circuit for existing sockets and 6A circuit for existing lights.

· Test existing outbuilding socket and lighting circuit.

· Connect existing circuits to outbuilding consumer unit.

· Test, certificate and notify work to comply with the wiring regulations and Part P of the building regulations

Feedback

Feedback for AWJ Electrical

Adam gave a very good quote and his work was completed under time and was very high quality. Also tidied and cleaned up afterwards. Very happy with this job would recommend 100%.