Make good a 3-bed flat for re-letting - Restoration & Refurbishment job in Clapham Junction, South London

Job description

Master Bedroom: Replace the broken power point with new to match the existing. Replace the blown laps to the down lights. Rub down and make and good to walls and ceilings and apply number two coats of emulsion. Rub down and make good to the woodwork and apply one under coat and one finishing coat.

En-suite Bathroom: Carry out re-grouting where necessary to the wall tiles. Cut off the silicon and replace with new. Replace the blown laps to the down lights. Rub down and make and good to walls and ceilings and apply number two coats of emulsion. Rub down and make good to the woodwork and apply one under coat and one finishing coat.

Hallway/Utility cupboards: Replace the blown laps to the down lights. Rub down and make and good to walls and ceilings and apply number two coats of emulsion. Rub down and make good to the woodwork and apply one under coat and one finishing coat.

Bedroom Two Replace the blown laps to the down lights. Rub down and make and good to walls and ceilings and apply number two coats of emulsion. Rub down and make good to the woodwork and apply one under coat and one finishing coat.

Bedroom Three Replace the blown laps to the down lights. Rub down and make and good to walls and ceilings and apply number two coats of emulsion. Rub down and make good to the woodwork and apply one under coat and one finishing coat.

Bathroom Replace the extractor fan with new to match the existing. Replace the toilet seat with new to match the existing. Carry out a repair to the bath panel and leave ready for redecorations. Rub down and make and good to walls and ceilings and apply number two coats of emulsion. Rub down and make good to the woodwork and apply one under coat and one finishing coat.

Living Room Replace the blown laps to the down lights. Rub down and make and good to walls and ceilings and apply number two coats of emulsion. Rub down and make good to the woodwork and apply one under coat and one finishing coat.

Kitchen Supply and fit a new Halogen hob into the existing worktop. Carry out a repair to the dishwasher door and adjust the kitchen unit doors where needed. Rub down and make and good to walls and ceilings and apply number two coats of emulsion. Rub down and make good to the woodwork and apply one under coat and one finishing coat.

Feedback

Feedback for Victory Construction

Very keen to win the work, then keen to do a good job. Clear and frequent communication throughout. Worked overtime to complete the job in a very tight timescale. Would definitely use again. Recommended.