New first floor bathroom and toilet - Bathroom Fitting job in Camberwell, South London

Job description

Remove and dispose of old bathroom suite.

Reconfigure bathroom by demolishing an existing partition wall to create a larger room, and constructing a new partition wall to create a new separate toilet (keep existing doorways).

Toilet: install new cloakroom washstand and high-level WC (already purchased); all necessary plumbing and connection of waste to soil stack (located on adjacent exterior wall); install new ceiling light; install new extractor fan; all necessary wiring.

Bathroom: install new free-standing bath and washstand (already purchased); install new shower tray in corner between chimney breast and exterior wall, box in pipes behind, built out side of chimney breast slightly to front of shower tray, install shower door and shower fittings. Install four new wall lights and halogen light over shower; install new extractor fan; install new radiator; install new electric towel rail; all necessary plumbing and connection of waste to soil stack; all necessary wiring.

Redecorate: replace skirting board and cornice in toilet and bathroom, painted tongue-and groove panelling up to dado rail in bathroom only, tile shower cubicle, wallpaper in toilet and above dado in bathroom. Floorboards sanded, gaps filled and painted in bathroom; tiles in toilet.

Feedback

Feedback for RZ Buildingservices LTD

We contracted Sam to remove our existing bathroom, knock down the wall with an adjacent room, and to install a new bathroom and separate WC. The work included the construction of a new partition wall; wiring of extractor fans, lights, and an electric radiator; internal and external plumbing; laying a wooden floor in the bathroom and a tiled floor in the WC; applying wooden paneling and dado rails; painting and hanging wallpaper; and hanging new doors.

Sam quoted a very competitive price. He brought with him a selection of photos of previous work, which reassured us that he had plenty of experience . He was able to start work at short notice. The phasing of payments also suited us perfectly.

A member of Sam’s team, Gregory, had day-to-day responsibility for our job, with Sam and others working some days depending on what was required. Everyone carried out their work to a very high standard and with great attention to detail. We were fairly relaxed about the timetable for the work, but Sam’s team, in particular Gregory, would often work late. The team were good-humoured and communicated with us well. They were also able to work flexibly around other building contractors during the work. At the end of the project, Sam arranged for a large pile of debris to be taken away.

We would not hesitate to recommend Sam’s team. We are extremely pleased with the end result and have had many people who have subsequently seen our bathroom, comment on what a great room it is.