Install gas fire and service boiler - General Building job in Bristol, Avon

  • Location
    Bristol
  • Trade
    General Building
  • Posted
    3447 days ago by home07957 (3 jobs)
  • Start date
    They would like the job done by: 7th Apr 2008
  • Hired

Job description

<p>2 main jobs:</p>

<p>1) The dining room has a chimney breast where an old back boiler and a gas fire was installed in the old fireplace. The old back boiler (25-30 years old?) has been taken out and junked, but the flue left in place. I've now got a Valor Urban Slimline gas fire in which I'd like to be installed above the fireplace - i.e. not floor level. The old fireplace hole will be walled up. I hope the new fire will be able to be connected to the existing flue. The gas supply is under the floor near the fireplace. The room is to be plastered, so I'd like the job to be in 2 stages, if necessary. First stage is for the hole in the wall to be prepared, and anything that needs to go in before the plaster done. Then I get the plasterer in. Once he has done his job, I need the installation completed.</p>

<p>The aim to make the chimney breast look more like <a href="http://www.fireplaces-oldham.co.uk/Verine_matrix_room.jpg">this</a>. (note, this shows a different fire in a different house)</p>

<p>The installation manual can be downloaded <a href="http://www.valor.co.uk/valor/website.nsf/746%20Quantum%20and%20Urban%20instal%20(5109644)%20.pdf">here</a>.

<p>Info about the fire:</p>

<ul><li>Fuel Type: Gas</li>
<li>Inset or Outset: Inset</li>
<li>Control Device: Bottom Manual Control</li>
<li>Safety Features: Oxysafe, Flame Supervision Device</li>
<li>Chimney Type(s): Brick Built Chimney, Pre-fabricated Flue or Pre-cast Flue</li></ul></p>

<p>2) I also need the boiler serviced. The boiler is a Worcester Greenstar 25 HE.</p>

Feedback

Feedback for build1551

Good work, thanks very much!