Loft boarding, insulation & ladder - Loft Conversions job in Leeds, West Yorkshire

Job description

Hi,

We would like the following work completing in our loft space by the end of August if possible:

  1. Install drop down steel ladder.

  2. Insulate entire roof with minimum 270mm mineral wool insulation (including under new storage area) to bring up to current requirements. Leave very old flat insulation in place.

  3. Board out area of approx 10m2 in chipboard for storage purposes. Existing joists are only 3x2 so a raised stronger sub-frame is likely required or strengthening of existing joists. Extent of boarding and strengthening method to be agreed following site visit.

  4. Cut down and remove old TV aerial in loft.

Thanks.

Feedback

Feedback for Insulation Direct Ltd.

The loft boarding and insulation works was completed to a good standard and within a day.