Concrete base for 10 x 8 shed - Groundwork & Foundations job in Hitchin, Hertfordshire

Job description

Dig out earth - approx 200mm below ground level
Put down formwork for 11 x 9 concrete base
Put down 100mm compacted hardcore
Lay down DPM
put down 150mm concrete


Feedback for Base Construction 2004 Limited

Base construction installed a concrete shed base for us. They had to change the date due to a digger not working which was ok as they let us know and used a hire digger instead. They worked hard and we we left with a level concrete base.
Unfortunately they did not cover it or advise us to do this and it was damaged by rain overnight. I informed Base construction and was advised to brush off the flaking top layer. I seeked a second opinion who advised that the base will deteriorate far quicker due to the damage and am therefore having to remedy at my personal cost and time. We also had to call up the digger hire company to arrange collection which I would expect Base construction to have done.