Kitchen remodelling change internal walls and new units - Conversions - General job in York, North Yorkshire

Job description

Kitchen/downstairs toilet and utility room remodelling including:-

Remove and dispose of 3.5m longbrickwork wall inc door (possibly supporting)
Remove and dispose 6.0m stud walling inc 3 doors
Remove and dispose of 3 no radiator
Supply and relocate 2 no radiators
Remove and dispose of old toilet and sink and making good the old toilet soil pipe
Supply materials and relocate feed water pipes and old sink drain for new washing machine location
Supply & install new 3.5m support beam (if required)
Supply & install 5m of new stud walling and 1 no internal door and 1no opening
Supply & install new toilet and sink combo under stairs
Supply & install new heater under stairs
Supply & install new under stairs toilet soil pipe to new manhole on existing drain outside
Supply & redirect hot/cold water pipes to new toilet and sink under stairs
Supply and install new under stairs sink drain.
Removing and disposing of old kitchen units.
Installing 15no new kitchen units (supplied flat pack).
Note connections for gas, dishwasher and sink drain and water supply are all in same locations (don't require any works to gas).
Supply & Install 20m2 new stone effect floor tiles (prob vinyl) throughout kitchen also in utility room and under stairs.
Supply and relocate all light switches 2no single light switchs, 1no double light switch.
Supply & relocate all appliance switches and sockets - Washer, Drier, Dishwasher, Cooker, Cooker hood, Fridge/freezer, 2no under counter heaters.
Supply & relocate 1no immersion heater switch.
Supply & relocate wall sockets 4no double,1no single.
Make good and plaster 18m of walls.
Supply & Installing 2 new ceiling spot lights on separate switches from rest of kitchen.

Anything else required to finish this job, final decorating will be done separately but walls and ceiling shall be left ready for decorating.

Feedback

Feedback for Steven purvis

Steve and his team did a great job of knocking through 4 rooms into one including structural work, installing a downstairs toilet and exterior drains, a new (flat pack) kitchen inc solid oak work surface and all associated plumbing electrical and gas works etc. The job was completed on time an on budget and well organised. Everyone was pleasant, professional and hard working. Steve kept us updated on progress and planning daily and the entire build was thoroughly cleaned on the last day and left ready to decorate. I was especially impressed that the support steel was installed in the internal wall without disturbing the plaster on the living room side. Thanks Steve for a finished job which exceeded expectations we wish you all well. We would 200% recommend Steve for any job large or small, and we will definitely use you again if we plan any future works. Please pass on our thanks to everyone, and hope you've managed to avoid flat packs for a while.