Connect new gas hob - Plumbing job in Tottenham, North London

Job description

Connection of new gas hob. A new pipe is already in place following refitting of new kitchen, it just needs the connections made at each end of the pipe. The non hob end of the pipe comes out under the stairs 200mm or so away from an existing gas supply pipe (all 15mm copper).

Gas connection only required, not the electrical connection.

I'd like the work done asap and quote to include time and materials.

Need to be Corgi etc registered (obviously)

Thanks

Dave

Feedback

Feedback for Essex Plumbing Division

Matt did a good job with minmum of fuss. Arrived on time carried out the job quickly, to a good quality and at the quoted price. Highly recommended.