Corrective work to newly fitted bathroom - Bathroom Fitting job in Heywood, Lancashire

Job description

I have recently had my bathroom fitted and am not happy with the work for the following reasons:-
1) The toilet water feed pipe is too far away from the toilet and looks silly
2) The heating pipes for the towel radiator were not alligned and one is off set to the towel heater and one is at a 45 degree angle to it.
The following work is required:-
Removing of some of the floor and wall tiles in order to access the pipework.
Moving the toilet pipe nearer to the toilet
moving the towel radiator heating pipes so they are in allignment.
replace the tiles that have been removed ( I understand that new tiles will be needed as the old ones will be smashed)

I am very dissapointed with the work that was carried out due to the above 2 reasons and it has affected my faith in tradesman and so unfortunately I have the following conditions for this job.

The tradesman must have :-
References or photos of work
Liability insurance
You must agree that if the work is not carried out to a high standard and I am not happy with the work you will not get paid.

I must apologise if this post seems unfair but I have had too many bad tradesmen do work for me to an unsatisfactory standard and this way will ensure that only excellent tradesmen apply for this job. I will need my kitchen fitting very soon and so a tradesperson who does high standard work will be secured for more work in my home. I will also be more than happy to recommend you to as many people as possible in order to ensure good tradesmen get alot of work.

Photos of the bathroom can be sent on request via email

Thank you for taking time to read this post.

Zoe

Feedback

Feedback for J-MACC Building & Property Repairs

Work was carried out professionally and the work was as I had hoped. The only downside is that due to the tiles having to be pulled up to correct the pipework and then put back in place, the tiles are now loose and will need to be re-laid and re-grouted.

I was expecting Lee to carry out the work but had to send his father instead to do the work.