Bathroom replacement plus utility plumbing - Bathroom Fitting job in Watford, Hertfordshire

Job description

Bathroom:
Removal of existing bathroom suite, new bathroom suite to be installed with same layout as existing bathroom.

Approximate bathroom dimensions:
length 220cm, width 170cm, height 230cm (less 75x55 external cupboard)

New suite consists of:
Whirlpool bath, Back to wall WC, concealed cistern, Wall hung basin.
(bathroom suite and taps are already on site, provided by customer)

Concealed cistern to be boxed in, but accessible. Bath side to be concealed but accessible (possibly tiled panel?)

To supply and fit all necessary pipe work and fittings to fit bathroom suite.

Bath rail for shower curtain, and toilet paper dispenser to be fitted.

Existing electric shower to be replaced, and associated electrics checked/fixed, shower pull cord to be removed from above bath, possibly replaced by switch in adjacent cupboard room.

Electric feed required for Whirlpool bath. (original bath does not require electric)

Existing electric bar heater to be removed, and new electric towel rail to be installed, with switch on outside of the bathroom.

Pull cord for light to be replaced with new pull cord.
Light fitting to be moved approx 50cm

Removal of old tiles (partially tiled), and tiling of full bathroom (walls and boxing).
Tiling of bathroom floor area (approx 190cm x 100cm)
Customer to provide tiles.

Tidying/skimming of bathroom ceiling.

Utility:
Adjacent to the bathroom is a small utility/cupboard room which houses the mains water supply, water tank, hot water cylinder and fusebox.
Existing copper cylinder has been removed, but existing pipework remains.
New 36"x18" copper foam-lagged cylinder to be supplied and fitted, along with necessary fittings. Cylinder has immersion only, there is no boiler.
Customer has immersion and thermostat already.

To supply and fit new lever type or switch stop-cock, (existing stop-cock requires wrench to turn)
To supply and fit all necessary pipe work and fittings to plumb washing machine. Washing machine waste returned via adjacent bathroom.

Materials (pipes/fittings/cable/adhesive/plaster etc.) to be supplied by tradesman, other materials to be provided where specified.

Will require references/positive feedback of similar work done.

Please see seperate job/project 'Kitchen replacement' for another project I require completing.

* The following information was added Wednesday, 11th March, 2009 :
Electrical socket (can be wall mounted) in utility area, to supply electric for washing machine.

Feedback

Feedback for Marbuild UK Ltd

I was very happy with my finished bathroom, it has been completely transformed, and the standard of finish is pleasing. Marcin and his team were friendly and he communicated well, asking pertinent questions when there were decisions to be made. I felt comfortable leaving them alone unsupervised to work in my home.