How long will a loft conversion take?
Anonymous user 17/03/2024 - 2.30 PM
On average how long will a loft conversion take to complete?
Are you a tradesperson and able to answer this question?
17 Answers
Anonymous user
dormer loft conversion with bathroom and 2 bedrooms takes 6 / 8 weeks from start to finish
Answered18 February 2011
72
Anonymous user
No one can honestly answer with out knowing the consruction, steel works, what type of windows, dormers, velux.
Taking into account plumbing, electrics, plastering, stairs etc, it would be more than 2/3 weeks
Answered17 February 2011
62
Anonymous user
those who have comented 2 /3 weeks are either cowboys or chancers, to do afull loft conversion under building regs , were you have to change every door and frame (exept wetrooms), maybe change lintls to satisfy load demands, an average loft will take between 6 to 10 weeks , anyone who says less proberly have never done a full loft under building control
Answered22 February 2011
46
Anonymous user
UK Management Builders can complete a typical loft conversion in FOUR weeks or less. This applies to a three bed semi: inculding a two/three tier staircase,velux windows and flooring with beams/Steel Rsj and good plaster/skim finish. We always show examples of our work to customers.
All firms are different in terms of how they work and some take longer...sometimes much much longer.
Always ask to see examples of work so you know what type of quality finish to expect for the prices you maybe getting.
Basically, It all boils down to man power, more chaps on job the quicker they finish... so to answer the question nobody really knows how long a loft conversion will take....we all know they should take 4-8 weeks max, but problems can occur which can delay the job; weather, finance, people not turning up to work, design issues (leaks/load bearing stresses), you may even discover damage to property which was "hidden" until one started converting the loft etc.
I hope the above helps and you have a happy conversion experience.
Regards
UK Management Builders LTD
Peace of mind builders
Answered18 February 2011
44
Anonymous user
The average dormer style loft conversion takes approximately 4 to 5 weeks to construct from start to completion.
Hope this helps!
Kind regards,
Alexander
Answered17 February 2011
31
Anonymous user
There are so many contributing factors to a loft conversion that it is very difficult to give an accurate timescale. For those that have stated 3 weeks must have a large workforce on a relatively small conversion.
In my experience they can take between 5 - 12 weeks.
Answered20 February 2011
29
Anonymous user
Hi there 2/3 weeks no way you are looking at 6/8 week to get it to a high Standard
Answered26 February 2011
22
Anonymous user
We regularly do loft conversions to building control and never take over 4 weeks these people who say 10 weeks hello feeling guilty for outrages quote you gave either that or sack your lads and get qualified tradesmen
Answered2 March 2011
17
Anonymous user
normally to complete a loft conversation take max.6weeks.
Answered18 February 2011
16
Anonymous user
I would say that most loft conversions should be complete in approx 2/3 weeks although there are many varying factors.
Answered17 February 2011
15
Anonymous user
Basic loft conversion should take no more than 2 - 3 weeks
Answered17 February 2011
14
Anonymous user
To build a loft conversion of 50m3 size on a good spec with new roof coverings and en suit bathroom should take between 6-8 weeks thats for a nice finish
Answered19 April 2012
14
Anonymous user
4-6 weeks actual build time, depending on size etc.
Answered12 March 2011
13
Anonymous user
2 months start to finish for a high spec conversion.
2 - 3 weeks for a square flat top box on top of your roof. Nasty nasty.....
In other words 2 - 3 weeks estimate is total rubbish!!
Answered3 July 2011
13
Cleverly associates ltd
Rating: 4.9 out of 5
A loft conversion should take on average 4 weeks. Thats what we work towards. There are many contributing factors of course - size, steels, access, weather! But most good builders should be able to completet start to finish (including snagging) in 4 weeks.
CAL Builders
Answered31 October 2011