Groundwork & Foundations jobs in Bures, Suffolk

3 x Drain Gully repair and restoration

  • Location: Colchester
  • Hired: Home & Garden
  • Trade: Groundwork & Foundations
Job Description

3 Drain Gullys in need of restoration. External brick work needs replacing and 1 of the gullies itself is cracked and needs repair. Property is end of terrace with drive and pathway to rear where 1 gully is based.

Foundations dug & filled

  • Location: Colchester
  • Hired: Design and Build
  • Trade: Groundwork & Foundations
Job Description

Please supply an approximate quote to dig & fill with concrete the foundations for a single storey extension. The extension will comprise of a brick/block structure. The dimensions are as follows: 6m wide, 3m long & 2m deep (approx) which I think equates to 36 cubic metres. Thanks

Concrete Base and Laying armoured cable

  • Location: Halstead
  • Hired: collinsbrickwork & building contractors
  • Trade: Groundwork & Foundations
Job Description

Hi,

We have 4 lamp posts that need flat concrete bases dug and laid, the lamp post are 134" in high so I guess the bases need to be a way down ( please let me know in the quote).

In addition we need two runs of amoured cable laid in the lawn , one down each side of the drive, happy for them to be laid a spade depth / gap, the length are no longer than 100m each , so that's 200 total.

We require the cable into the concrete bases so we can wire the lights.

Please quote a fixed price for groundworks , concrete, laying cable. ( cable will be supplied by us)

Thanks and look forward to a success for job!

Peter

Cincrete base for a 10 x 20ft workshop.

  • Location: Colchester
  • Hired: collinsbrickwork & building contractors
  • Trade: Groundwork & Foundations
Job Description

Hi
I am looking for someone to lay a concrete base for a 10 x 20ft shed/workshop. The job needs to be done ASAP.

Kitchen floor preparation

  • Location: Colchester
  • Hired: collinsbrickwork & building contractors
  • Trade: Groundwork & Foundations
Job Description

Our kitchen floor is approximately 2.70m x 1.50m and covered in old tiles. The lino specialist who completed our recent bathroom conversion said the floor needed cement scree applied before lino can be laid. An approximate quote for this would be great.

* The following information was added Tuesday, 22nd December, 2009 :
Have uploaded a few pictures to show the current floor surface. The fix at the moment is a temporary one simply to make the room look better until we can afford to renew the kitchen.

garden needs concreting

  • Location: Ipswich
  • Hired: Design and Build
  • Trade: Groundwork & Foundations
Job Description

my garden is a mess at the moment, its just a wet sloppy mess..
garden has no grass just all mud, would like garden to either be concreted or slabbed, i don't want it to be perfect just clean and tidy...

MyBuilder for Tradesmen

Sign up
Register as a Tradesman
Express interest in jobs
Choose the jobs you want
Get Shortlisted
Job posters will add you to their shortlist
Win Work, Get Feedback
Positive feedback gets you more work
"Excellent website! I have been a member of other lead websites and MyBuilder is by far the best."
ddf-windows-ltd
Locations
>Bures
>Sudbury
>Halstead
>Colchester
>Braintree
>Witham
>Manningtree
>Ipswich
>Haverhill
>Maldon
>Dunmow
Read about MyBuilder in the Press